Głogów Multidisciplinary Studio
The Głogów Multidisciplinary Studio, employing several people, is an important link between BIPROMET S.A. and the plants and divisions of KGHM. The Studio’s specialists, who work mainly on the premises of the Głogów Copper Smelter, play an important role as local technical support for other studios and departments of BIPROMET S.A. The key advantage of the studio is its direct presence at the plants, which significantly improves task implementation. As a result, many formal and technical matters can be handled on site, without the need for long business trips, saving time and enabling a rapid response to the investor’s needs.
The Studio is managed by Marcin Bartnik, who emphasizes its specific nature as a unit that, in practice, provides support for all BIPROMET S.A. employees, particularly in situations requiring quick intervention, arrangements, site inspections or clarification of the scope of work.
“The presence of our employees in Głogów allows us to solve problems efficiently without involving people from Katowice. We are able to respond quickly to the investor’s needs at all KGHM smelters. We are a team dedicated to the Głogów Copper Smelter, but when needed, we also travel to other smelters and plants of Polska Miedź. Often, within just a few dozen minutes, we are wherever we are needed. This is our great asset and advantage,” says the manager, adding that the Studio’s specialists are currently involved mainly in smaller mechanical and electrical projects, as well as ongoing technical support. He also recalls the implementation of the largest Pyrometallurgy Modernization Programme at the Głogów Copper Smelter.
The construction and commissioning of modern installations, including the flash furnace at the Głogów smelter, required the involvement of significant BIPROMET S.A. resources, constant monitoring of work progress and quick responses to emerging problems.
“At that time, our team consisted of a dozen or so people, including several regular collaborators and specialists from various disciplines. Other demanding and very interesting projects carried out by our Studio in previous years included waste heat boilers, also for Głogów. Today, we are implementing, among others, a project related to the construction of a new power supply for the Main Administrative and Social Building, as well as the replacement and installation of new safety cords on 60 conveyors in the P21 department at the Głogów Copper Smelter. In addition, we participate in a number of smaller tasks, such as minor design changes, documentation supplements and technical consultations. These tasks are carried out locally, in cooperation both with other studios of our company and with KGHM employees, including in the area of ongoing technical issues requiring the direct presence of our specialists on the smelter premises. This solution increases the efficiency of the entire organization, enables faster decision-making and reduces the costs and time associated with travel and business trips, and above all allows us to respond very quickly to the investor’s current needs,” adds Marcin Bartnik.
Although the Głogów Multidisciplinary Studio is currently involved in smaller projects, its role within BIPROMET’s structure remains very important. It provides a permanent point of technical support that complements the work of other designers and contractors, ensuring continuity of work, operational flexibility and efficient handling of the ongoing needs of clients and implemented investments.