Construction of a component manufacturing plant for the automotive industry


 
Location: Bielsko-Biała, Polska
  • Task: Designing
  • Date: 2004-2006
  • Investor: EATON Automotive System sp. z o.o.
  • References (in polish):  PDF Download references 

Description and scope

Service: Engineering

Making comprehensive technical documentation at all required stages of investment, including: land development project, architecture and construction of the production hall, external networks and internal systems. Obtaining all necessary administrative decisions, including, among others, environmental decision and building permit decision. Providing author’s supervision.

Technical data of the investment: area of 110,000 m2, developed areas (production hall with technology) - 25,000 m2, paved surfaces (squares, roads) - 25,000 m2.

Objective and result

Based on BIPROMET's S.A. documentation, construction of a modern production facility in the world's leading group in the automotive sector.