Construction of a new tape coating line
Location: Świętochłowice, Poland
- Task: GRI
- Date: 2005-2007
- Investor: ArcelorMittal Poland S.A.
- References (in polish): PDF Download references
Description and scope:
- Multi-discipline technical documentation, construction of a new hall and development of a new technological line, obtaining the necessary permits and administrative decisions, including: environmental decision and building permit decision.
- Construction and assembly works along with assembly of equipment and a technological tape coating line.
- Area of development of the new production hall: 5200 m2.
Objective and result:
Based on BIPROMET’s documentation, expansion of a modern production line design. Increasing the plant's production capacity and increasing its production capacity within the scope of the new product range