Preparation of multi-branch technical documentation at the PB and PW stages of expansion of the Zinc Rectification Department with additional three re-destillation columns.
- Task: Projektowanie
- Date: 2011-2012
- Investor: Huta Cynku Miasteczko Śląskie S.A.
- References: PDF Download reference
Description and scope:
Service: Engineering
Making complete, multi-level documentation on concept, an environmental impact report, a construction design for building permit, and 44 detail engineering documentations including the cost part of the task. The task included preparation of an expansion project of a part of the Zinc Rectification Department, a production hall design, a complete de-dusting installation design with a 30-metre chimney, land development with roads and squares project, projects of necessary networks and external infrastructure, introduction of additional fire safety arrangements.
Objective and result:
Based on BIPROMET's S.A. documentation, expansion of the Zinc Rectification Department, which created a capability to produce zinc in grade Z1 - 99.99%.