Pyrometallurgy Modernization Program
- Task: Designing
- Date: 2010-2016
- Investor: KGHM Polska Miedź S.A. Huta Miedzi Głogów I
Description and scope:
Service: Engineering
Making complete, multi-discipline technical documentation and obtaining a building permit. Mega-project that included 2000 design documentations submitted for implementation, 30,000 tons of steel structures, buildings up to 65 m of height, power of installed devices - several dozen MW. Multi-stage coordination of design work in all required disciplines:
- architectural and construction,
- process,
- technological,
- mechanical and installation,
- electrics automation,
- control and instrumentation roads.
Preparation of tender documentation in the form of technical and technological documents. Documentation implemented in 3D technology. Providing author's supervision. Full cooperation with the Investor and the Contract Engineer.
Objective and result:
Change of copper production technology at Głogów I Copper Smelter. Modernization of the plant, and achievement of the required environmental parameters with a clear improvement in the copper production index.